Solar Panels are classified under PDR Permitted Development Rights, as long as you are not in an  (ANOB) Area on of natural outstanding beauty, under a listed building or conservation area you are permitted to install solar panels.

Here is how we put Solar PV on your roof.

After inspecting the roof structure we;

Step 1: Erect the Scaffolding
for the installation team, Safety scaffolding will be erected around your house.

Step 2: Attach Roof Anchors
After the scaffolding is up, the team starts out by attaching the roof anchors taking care not to split the roofing felt, which will hold the solar panels.

Step 3: Attach the Frame
After the ally anchors have been installed, it’s time to attach the lightweight Aluminium frame, which is made up of aluminium bars.

Step 4: Install the Solar Panels
Once the frame has been attached, the installation of the solar panels can begin. The solar panels are clamped to the aluminium frame

Step 5: Wire the Solar Panels
Now that the panels are fastened securely to the frame, the next step is to wire them up.

Step 6: Make Final Connections to the Consumer Unit
After the panels are wired to the Solar inverter, the final connections to the consumer unit will be made.

Step 7: Test the Solar Panels
After the panels, the inverter, and the generation meter are all wired together, the installation needs to be tested. Once this is complete, the solar panel installation process has been successfully completed

 